The Projects

Central Queensland Power

CQP is being jointly developed by RES and Energy Estate and their vision is to assist in the acceleration of the energy transition and decarbonisation of the heavy industry and communities in the Central Queensland region.  

The portfolio of strategically located wind, solar and energy storage projects in Central Region is designed to enable a robust and resilient supply chain for the renewable energy sector in Queensland using the natural advantages of the regions of Rockhampton and Gladstone, as well as their ideally located ports. 

A Greener Future

CQP is committed to preserving the environment and minimising potential impacts throughout the Project's lifespan. By replacing electricity generated from other sources such as fossil fuel power stations, renewable energy can lead to an overall reduction in Queensland’s carbon emissions.

Powering more than 250,000 homes each year

Contributing to the Queensland Renewable Energy Target of 50% renewable electricity by 2030.

Utilising existing access tracks and road reserves

The Project design prioritises the use of previously cleared areas, which account for 40% of the total project disturbance footprint.

Offsetting 780,000 tonnes of CO2 annually

That’s the equivalent of planting 18 million trees every year.

Minimal impact on the productivity of traditional farming

With a footprint of less than 6% of the site area, the Project allows for the continuation of farming activities.

  • $6.7bn+​

    Capital expenditure ​

  • 400+

    jobs during development 

  • 4500+

    jobs during construction 

  • 550+

    jobs during operation​